Client: Everyman Cinemas

Location: Nationwide

Sector: Entertainment & Leisure

Everyman Media are a long standing and valued client and our latest project saw us complete a 3 screen cinema in the heart of London’s Kings Cross. Initially tasked with designing the Electrical Installation within a 4 week period and with a remit of producing working drawings for numerous disciplines such as Small Power, Containment, Distribution, Lighting, Central Battery Emergency Lighting, Fire Alarm and AV Control Wiring. After the initial design period works began on site and on program with a period of 14 weeks to complete the project it was all systems go!

Given the location of the project and the constraints on site regarding logistics, the project was certainly a challenging one, however after a great effort by all the team we handed over on time and on budget within the allocated 14 week schedule. The Client was delighted with the end product and the Cinema flourishes is the heart of the Capital.

We have now completed 5 Everyman projects and are proud to announce that we have been chosen as one of only two electrical contractors to carry out all future electrical works on the cinemas Nationwide!

Our Most Recent Projects

Dunnington Electricals Ltd

10 Cardale Court, Beckwith Head Road, Harrogate, North Yorkshire, HG3 1RY

t: 01423 771017

e: email hidden; JavaScript is required

VAT: 946292789

Reg No: 06797513

© Copyright 2019 Dunnington Electricals Ltd. All Rights Reserved.